PANTECH CONSULTING ENGINEERS · (803) 252-4155

Home

About Us

James E. Hunter, PE

James M. Atwater, PE

Peter J. Rieck, PE

Michael H. Hance, PE

Steven M. Tyler, PE

Sorin F. Glavascu, MSME

Engineering Services

AUTOMATED MACHINE DESIGN

DAMAGE & DUE DILLIGENCE

ELECTRICAL ENGINEERING

MECHANICAL ENGINEERING

NUCLEAR INDUSTRY

PROCESS CONTROL STRATEGY

SEISMIC ANALYSIS

STRUCTURAL ENGINEERING

Projects

Educational

Government & Military

Heavy Industrial

International

Machines

Nuclear

Water & Wastewater

Location Map

Project Files

Lexington Pump Station

SCDOT-Chester

Employment

Contact Us

Water and Wastewater Treatment

Meeting increasingly stringent water and wastewater quality standards, Pantech engineers have designed numerous additions and improvements for Water and Wastewater treatment plants in South Carolina and Georgia.  We specialize in design and specification for Ethernet and wireless SCADA systems, medium and low voltage power distribution for Aerobic and Anaerobic treatment as well as flocculation, sedimentation, and filtration systems for water treatment.  Our designs incorporate reliable power distribution systems along with standby generation to provide the stability and reliability these facilities require.

Wastewater Treatment Plant Upgrade Dillon, SC – Electrical design of power distribution and communications upgrade for Dillon and Cypress Pond Wastewater Treatment Plant including new Bar Screen, new Aeration Basins, new Chlorine Contact chamber, new 10,000sf building, replacement of existing 250HP Reduced Voltage Autotransformer (RVAT) starters with new Variable Frequency Drives (VFDs)., new motor control centers, transient voltage surge suppression (TVSS), and new emergency standby generation to serve approximately 3MGD addition to plant treatment process.

New Wastewater Treatment Plant Cayce, SC – Electrical design of power distribution, and PLC-based Supervisory Control and Data Acquisition (SCADA) system for new 25 MGD Wastewater Treatment plant including Headworks, Aeration, RAS, WAS, Centrifuge, Chlorination, two story Office building, emergency standby generation.  27kV double-ended metal-clad switchgear with generator control section, 23.9kV underground  concrete-encased power loop, three phase, dead-front, pad mounted transformers, low voltage switchboards, motor control centers, TVSS, parallel 1500kW, 480V generators.  Approximate project cost $52M.

New Wastewater Treatment Plant Jessup, GA – Electrical design of power distribution and SCADA for new 3.5MGD Wastewater Treatment Plant including Bar Screens, Aeration Basins, Sludge Holding, Centrifuge, Chlorine Contact chamber, Effluent Pump Station, and Office building.  Variable Frequency Drives (VFDs) with dv/dt filters utilized to maximize process and minimize power consumption.

New Wastewater Treatment Plants; BAHA Region - Saudi Arabia – Electrical design of power distribution and SCADA system for nine (9) new Sewage Treatment Plants (STPs) ranging in size from 1500 m3 per day to 12,500 m3 per day including Bar Screens, Aeration Basins, Membrane Thickeners, Sludge Holding, Centrifuge, Ultraviolet disinfection, Effluent Pump Station, and Chemical Storage and pumping.  Variable Frequency Drives (VFDs) were utilized to maximize process and minimize power consumption.

Riverside Water Treatment Plant #1 City of West Columbia, SC – Electrical design of new 480V, 2500A, three phase, service entrance with provision for future emergency standby generator, power distribution, and PLC-based communications upgrade for Water Treatment Plant including new Blowers, Lime Silo, New MIOX disinfection system, upgrade of Flocculators and Sedimentation Basins, new Trac-Vacs, and new motor control centers.

Greenhill Standpipe City of West Columbia, SC – Electrical design for new emergency standby generator and automatic transfer switch, new service entrance, modifications to existing PLC-based SCADA system.

Platt Springs Elevated Tank City of West Columbia, SC - Power distribution and communications upgrade for addition of altitude valve at existing elevated tank.

Industrial & Domestic Water Supply Savannah. GA - Complete electrical design and project management for power, instrumentation, controls, and SCADA for $15M upgrade for the City of Savannah Industrial and Domestic Water Supply.   Also upfit of existing system, adding variable frequency drives, phase protection, and lightning protection.


©2011 Pantech Engineering, LLC

Web Hosting powered by Network Solutions®